Skip to content
LKM ConstructionGeneral Contractor Get an estimate
Remodeled kitchen with white shaker cabinets, a quartz island and black pendant lights

Kitchen remodeling in Woburn, MA

The kitchen is the room that works hardest in the house. We rebuild it around the way you actually use it.

Get an estimate

Illustrative image

01

It starts with the layout, not the cabinets

Most kitchens that feel wrong have a layout problem. The fridge opens into the doorway, there is no counter next to the stove, two people cannot pass each other. New cabinets on the same bad layout give you a nicer version of the same frustration.

So the first conversation is about how the room gets used. Who cooks, where the groceries land, whether you want people sitting at an island or out of the way. From there we work out what should move and what can stay. Keeping the sink and range where they are saves money that can go into better materials, and we tell you plainly when a move is worth it and when it is not.

White subway tile backsplash, quartz countertop and a matte black kitchen faucet
Illustrative image
02

What happens behind the finished surfaces

A kitchen remodel touches almost every trade: demolition, framing, plumbing, electrical, drywall, flooring, cabinets, countertops, tile and paint. Each one depends on the one before it. If the wall is not flat, the cabinets will not line up. If the outlets are in the wrong place, the backsplash gets cut twice.

As the general contractor we schedule those trades in the right order and check the work at each step. Wiring and plumbing are roughed in and inspected before the walls close. Cabinets go in level before the countertop is measured. Tile comes after the counters, so the lines land where they should.

Kitchen stripped to the wood framing, with wiring and plumbing roughed in
Illustrative image
03

Living in the house while the work is going on

Being without a kitchen is the hard part for most families. Before we start, we go over the schedule with you: which days are loud, when the water is off and when the room is usable again. We close off the work area to keep dust out of the rest of the house and clean up at the end of each day.

When the work is finished we walk the kitchen with you, open every door and drawer, and write down anything you want adjusted. The job is done when that list is empty.

Remodeled kitchen with white shaker cabinets, a quartz island and black pendant lights
Illustrative image

What is included

What a kitchen project can cover.

  • Cabinet installation and replacement
  • Quartz, granite and butcher block countertops
  • Tile backsplash and tile floors
  • Hardwood and vinyl plank flooring
  • Islands, peninsulas and layout changes
  • Lighting, trim and paint to finish the room

Common questions

Before you call.

How long does a kitchen remodel take?

It depends on the size of the kitchen and how much is changing. An update on the same layout is faster than a full gut with walls and plumbing moved. Once we see the room, we give you a schedule for your project.

Can I keep my layout and still remodel?

Yes. Keeping plumbing and appliances where they are is a common way to control cost while still getting new cabinets, countertops, tile and flooring.

Do I need a permit for a kitchen remodel?

In Massachusetts, work that changes structure, plumbing or electrical generally needs a permit from the city building department. We tell you what your project requires before work starts.

How do I get a price?

Send the form on this page or call. We look at the kitchen, talk through what you want and give you a written estimate.

More from LKM

Other work we take on.

Free estimate

Tell us about the project.

Fill in the form and it opens a text message to us with everything already written. Or just call.

(857) 249-5706

info@lkmremodeling.com

LKM Construction and Remodeling Inc · Woburn, MA

Call Get an estimate